Privacy engineering and privacy policy are not the same thing.
The legal entity, corporate enquiry retention schedule and privacy contact are confirmed. International-transfer terms and solicitor review remain open.
Implemented
Engineering evidence
- Account data export and portability tooling
- Erasure workflows, with product-specific operational differences
- Tenant isolation at the database layer
- Consent and suppression logic in communications workflows
Approval required
Policy inputs
- Qualified solicitor review
- Vercel and Brevo processor terms
- Provider regions and transfer mechanisms
- Separate controller/processor analysis for each product
Corporate-site privacy content is drafted, with its approval boundary visible.
Read the draft notice or send a privacy and data-rights enquiry through the trust-routed form.
Exercise a privacy right.
Use the form or email trust@chatursystems.com. Do not paste identity documents or unrelated sensitive data into this first message; we will follow up if verification is required.